Equipment & Specifications – Najad 34
The boat has been continuously upgraded with a focus on reliability, comfort, and modern systems. Below is an overview of equipment and major improvements.
Yanmar engine from 2008 with < 1,000 hours
Lithium battery system 300 Ah (2025)
Maxprop 3-blade feathering propeller (2022)
New sprayhood (2025)
AIS Class B (2025)
Only two owners
Length: 10.45 m
Beam: 3.10 m
Draft: 1.60 m
Displacement: approx. 7 tonnes
Air draft: approx. 13 m above deck
Increased freeboard → standing headroom approx. 1.90 m (also in the head)
Inboard shrouds
Lloyd’s Register of Shipping
Yanmar 3JH4E, installed 2008
Less than 1,000 engine hours
Shaft drive
Maxprop 3-blade feathering propeller (2022)
House battery upgraded to 300 Ah lithium (2025)
New starter battery (2025)
Victron DC/DC charger
Victron shore power charger
Solar panel mounted on stern rail, controlled via Victron MPPT
Battery monitoring via Victron BMV-712
Garmin chartplotter – GPSMAP 723
Garmin BlueChart G3 Vision 721L (Northern Europe)
VHF radio
Garmin AIS 800 Class B transceiver (2025)
Garmin DST810 (depth, speed & temperature)
Wind instrument (VDO)
VDO log (speed and distance)
Hydraulic autopilot, connected directly to the quadrant
Electric toilet (new 2024)
All hoses for toilet and holding tank replaced (2023)
Holding tank with deck pump-out
Pressurised water in galley and head
Hot water via engine cooling system
Refrigerator
Gas stove with oven
Very well-maintained mahogany interior
Forward cabin with two full-length berths
Head to port
Hanging locker to starboard
Saloon with U-shaped sofa (convertible to double berth)
Quarter berth / sea berth
Chart table
Galley with generous workspace
Mainsail 26.5 m², full batten
Jib 25 m²
Genoa 42 m²
All sails from UK Syversen, in good cruising condition
Gennaker 75 m² (Neil Pryde)
Selden Rodkick
Backstay tensioner
Lewmar self-tailing winches
Sprayhood (2025)
Anchor bow – 15 kg Bruce
Anchor stern – Fortress
Very good hull condition and finish
Teak deck in good condition for its age
Antifouling: International Trilux
2024: new upholstery throughout (some cushions replaced)
2025: new curtains
All lighting upgraded to LED
Mooring lines
Fenders
and more